Badezimmerschiffswaschbecken Wasserhahn gebürstet Nickelschüssel hoher Körper Einer Griff ein Lochdeck-Deck-Mount Edelstahl TM-FA-SS029
Modell: | TM-FA-SS029 |
Standard: | Edelstahlarmatur |
Einheit: | STK |
Herkunft: | China |
Produktivität: | 200,000/Monat |
Maximale Bestellmenge: | 500,000/Monat |
Mindestbestellmenge: | 1000 |
Verpackung: | Doppelte Clamshell/Blisterkarte/Großverpackung |
TransTime: | 25-30 Tage nach Auftragsbestätigung |
Transport: | Seetransport |
Zahlung: | T/T |
- Beschreibung
- Allgemeine Geschäftsbedingungen
About This Item
【Quality Promise】 : The faucet is made of SUS304 Stainless Steel with outstanding corrosion resistant performance for ensuring high quality and better durability. The lead-free material can not only prevent tarnish and rust but also keep you and your family safe from harmful chemicals.
【Special function】: Designed to fit 1 hole configuration which can be used in different climates and environments. The water from our faucet is soft and rich and will not cause splashing in the process of washing your hands.
【Easy Installation】: Single hole deck mounted sink faucet, Sink mounting hole 1.26 inch (3.2cm) to 1.57 inch(4cm) with a pair of 60cm hot&cold water hoses included.Come with all mounting hardware.
【Everyday Convenience】: Bathroom sink faucet with effortless flow and water temperature control, making it more convenient for your daily life. Aerated flow is ideal for everyday bathroom tasks, like brushing teeth and washing hands.
Produktbeschreibung
Faucet Style: Zeitgenössisch & Commercial
Kalt und heißer Schalter: Ja
Mounting: Deck Mount
Installationslöcher: One Hole
Hole diameter:1.26 inch (3.2cm) to 1.57 inch(4cm)
Number of Handles: Einzelgriff
Farbe:Brushed Nickel
Ventiltyp: Keramikventil
Faucet Body: SUS304 Stainless Steel
Drain Included: Ja
Cover Plate Included: No
Water Mode: Stream
Wassermerkmal: Mix Hot And Cold
1. Preisbedingung: | FOB Ningbo |
2. Zahlungsfrist: | 30% TT-Anzahlung, Balance gegen Kopie von B/L |
3. Mindestbestellmenge: | 2000STK |
4. Mustervorlaufzeit: | 7-10 Tage nachdem alle Details bestätigt wurden |
5. Lieferzeit: | 25-30 Tage nach Auftragsbestätigung |